 JP Morgan Chase Company, New York City

 

What was achieved:

  • A technology study of merger and capacity enhancement needs of JP Morgan’s and Chase Manhattan’s online Credit Card Processing infrastructure .

 

  • Developed and implemented a Disaster Recovery project during post September 11 period.

 

Both phases were completed on time and on budget despite the September 11 tragedy affecting the bank’s premises near the World Trade Center. We are currently engaged in assisting the client with additional phases of the work.

 

The Project

 

JP Morgan Chase is a major US financial institution based on the recent merger of JP Morgan and Chase. 
 JP Morgan Chase started a project to replace the Single Sign On (SSO) software so additional concurrent
 credit card applicants could enter on line at the same time.  Starting in October 2000, our firm worked
with the business side to scope the project approach, understand the business requirements and
 fall-back procedures.

 

JP Morgan Chase specified an eight month project plan that was limited to establishing a new SSO
 hardware environment, installing the new SSO application and provide both QA and Production
 functionality and scalability testing.  During the project, we established that the existing firewall
 infrastructure was limiting capacity requiring a change over to a PIX firewall environment.  This added extra
complexity to the original project tasks including a real time factor to install and test new firewall
architecture.  This new architecture also required both the existing production and new production servers
 to change Internet Protocol (IP) addresses as well as routers and DNS servers.  The firewall changeover
 actually occurred in the middle of the SSO project and dramatically improved network capacity.

 

This project was completed on time and the new capacity was more than adequate to serve current loads
 and future growth. Extrapolating from this project was the Disaster Recovery project which included major
 upgrades where phase 1 was to establish a separate physical presence of the SSO and summary
 application features.   

 

The DR project included a major upgrade to on-line banking applications. Complexities in coordinating
 the data migration, data connectivity and customer 5-wave rollout was a challenge since the project
 dynamics were so immediate.

 

To assist Credit Card Services (CCS) improve their understanding of the  operation, we used
 our High Performance Enterprise Engineering
approach to create an enterprise view  of the
 entire CCS operation in order  to develop existing business process models and operating metrics.

 

 

 

 